Announcement

Notification for Public Comment Exercise on Draft Technical Code of the Communications Multimedia Industry
- 17 January, 2023
Notification for Public Comment Exercise on Draft Technical Code of the Communications Multimedia Industry
17 January, 2023The public is invited to submit comments or opinions on the following Technical Code (TC) draft developed by the International Mobile Telecommunication (IMT) & Future Networks Working Group (IFN WG) under the Malaysian Technical Standards Forum Bhd (MTSFB), which are currently at the final stage of the approval process.
Project no. | Title of Draft Technical Code | Duration |
MTSFB2208R1 | IMT-2020 (Fifth Generation) - System Architecture and Specifications (First Revision) | 17 January - 16 February 2023 |
The draft documents can be downloaded and comments can be submitted via the Public Comment page here.
All comments must reach MTSFB no later than the stated deadline of the public comment exercise to be valid for consideration.
For further information, please contact us for details as follows:
Malaysian Technical Standards Forum Bhd (MTSFB)
Level 3A, MCMC Tower 2
Jalan Impact, Cyber 6
63000 Cyberjaya
Selangor Darul Ehsan, MALAYSIA
Tel: +603 8680 9950
Fax: +603 8680 9940
Email: admin@mtsfb.org.my

Registered Technical Codes in 2022 (December)
- 19 December, 2022
Registered Technical Codes in 2022 (December)
19 December, 2022Under the Section 95 of the Communications and Multimedia Act 1998, the technical code titled 'Radiocommunications Network Facilities - Minor Communications Infrastructure' (MCMC MTSFB TC T035:2022) has been officially registered and published, which is subsequent to the approval of the revision of Garis Panduan Perancangan Infrastruktur Komunikasi (GPP-I).
For a full list of MTSFB's technical codes, visit: https://mtsfb.org.my and click 'Download' on top of the page.

Notification for Public Comment Exercise on Draft Technical Code of the Communications Multimedia Industry
- 23 November, 2022
Notification for Public Comment Exercise on Draft Technical Code of the Communications Multimedia Industry
23 November, 2022The public is invited to submit comments or opinions on the following Technical Code (TC) draft developed by the Internet of Things and Smart Sustainable Cities Working Group (IoT WG) and Fixed Wireless Terminal Working Group (FWT WG) under the Malaysian Technical Standards Forum Bhd (MTSFB), which are currently at the final stage of the approval process.
Project no. | Title of Draft Technical Code | Duration |
MTSFB2109R0 | Baseline Security Requirements for Consumer IoT Devices | 11 November - 10 December 2022 |
MTSFB2112R0 | Maritime Radiocommunications Equipment - Specifications | 22 November - 21 December 2022 |
MTSFB2211R0 | Aeronautical Radiocommunications Equipment - Specifications | 22 November - 21 December 2022 |
The draft documents can be downloaded and comments can be submitted via the Public Comment page here.
All comments must reach MTSFB no later than the stated deadline of the public comment exercise to be valid for consideration.
For further information, please contact us for details as follows:
Malaysian Technical Standards Forum Bhd (MTSFB)
MCMC Centre of Excellence
Off Persiaran Multimedia, Jalan Impact, 63000 Cyberjaya
Selangor Darul Ehsan, MALAYSIA
Tel: +603 8320 0300
Fax: +603 8322 0115
Email: admin@mtsfb.org.my

Registered Technical Codes in 2022 (July and August)
- 22 September, 2022
Registered Technical Codes in 2022 (July and August)
22 September, 20228 Technical Codes have been registered by MCMC in July and August 2022 under Section 95 of the Communications and Multimedia Act 1998:
RADIOCOMMUNICATION/MOBILE
TYPE APPROVAL
- Specification for Digital Terrestrial Television (DTT) Broadcast Receiver (Second Revision)
- Specification for Direct-To-Home (DTH) Broadcast Receiver for Set Top Box (STB) (Second Revision)
- Digital Terrestrial Television (DTT) - Active Indoor Antenna (First Revision)
- IMT Advanced (Long Term Evolution) - User Equipment (First Revision)
IPV6/GREEN ICT/IOT
- Internet Protocol version 6 (IPv6) - Deployment Requirements to Complete Transition to IPv6
- Fuel Cell System - General Operational and Safety Requirements
- Fuel Cell System - Stationary Backup Power Solution for Telecommunication Sites
For a full list of MTSFB's technical codes, visit: https://mtsfb.org.my and click 'Download' on top of the page.